Your position: Home > News

Precast Concrete Batching Plant

 2023.02.15

The precast concrete batching plant is a compulsory and efficient equipment, which can produce plastic, dry hard concrete, fluid concrete, lightweight aggregate concrete and other concrete, with high production efficiency. It is mainly used in prefabrication plants for the production of concrete products. The precast concrete mixing plant mainly has the following advantages: the principle of twin shaft concrete mixing is adopted, the mixing blades have both revolution and rotation, the mixing movement is strong, the mixing efficiency is high, and the energy consumption is low. High-precision metering system is adopted to ensure metering accuracy. Using unique control software, with powerful database query function, so that the product can be traced back to its source.

 

precast concrete batching plant precast concrete plant

 


Precast concrete batching plant has a high degree of mechanization and automation, so its productivity is also high, and it can ensure the quality of concrete and save cement. It is often used in large and medium-sized water conservancy, electric power, bridges and other projects with large concrete engineering volume, long construction period, and concentrated construction sites. The precast concrete batching plant is a concrete mixing plant mainly for commercial purposes, which should be efficient, economical, and meet the requirements of environmental protection.

After years of development, the technology of precast concrete batching plant is becoming more and more mature, and high-efficiency, low-energy-consuming equipment is flooding the market. In actual production, there are many factors that affect the mixing time. Concrete with different strength grades requires different mixing times, concrete is thin and thick Not the same, the mixing time is different; the concrete of the same strength level, the construction site is different, the mixing time is different; the concrete of the same strength level, the admixture is not the same, especially after adding powder, the mixing time is different. The mixing time of normal temperature concrete and winter It is different, the size of the stones is different, the mixing time is different, the number of stones is different, the mixing time is different. Therefore, the mixing time should be set in the mixing ratio sheet, a single setting, and the mixing time specified in the mixing ratio sheet should be given priority.